puma.git
4 months agoMerge version 6.6.0-2+rpi1 and 6.6.0-4 to produce 6.6.0-4+rpi1 trixie-staging archive/raspbian/6.6.0-4+rpi1 raspbian/6.6.0-4+rpi1
Raspbian automatic forward porter [Thu, 31 Jul 2025 18:32:56 +0000 (19:32 +0100)]
Merge version 6.6.0-2+rpi1 and 6.6.0-4 to produce 6.6.0-4+rpi1

5 months agoMerge puma (6.6.0-4) import into refs/heads/workingbranch
Athos Ribeiro [Thu, 17 Jul 2025 10:20:19 +0000 (07:20 -0300)]
Merge puma (6.6.0-4) import into refs/heads/workingbranch

5 months agoUpdate example certificates
Athos Ribeiro [Tue, 15 Jul 2025 13:38:43 +0000 (10:38 -0300)]
Update example certificates

Bug-Debian: https://bugs.debian.org/cgi-bin/bugreport.cgi?bug=1078640
Forwarded: not-needed
Last-Update: 2025-07-15

Update the example certificates so that the upstream unit tests keep
passing throughout the next Debian release (trixie) support cycle.  This
is done by updating the certificates validity to 11 years (possibly
covering LTS/eLTS).
Last-Update: 2025-07-15

Gbp-Pq: Name 0020-update-ex-certs.patch

5 months agoAdapt test certificates generation
Athos Ribeiro [Thu, 17 Jul 2025 09:35:51 +0000 (06:35 -0300)]
Adapt test certificates generation

Bug-Debian: https://bugs.debian.org/cgi-bin/bugreport.cgi?bug=1078640
Forwarded: not-needed
Last-Update: 2025-07-15

Adapt the test certificates generation process to Debian. For that, we extend
the validity of the certificates to 11 years to try to cover the Debian support
(and hopefully the LTS/eLTS) window as long as a build is performed 1 year
before a release. We also require certificate_authority from the installed
package so we can generate this certificates without external packages.
Last-Update: 2025-07-15

Gbp-Pq: Name 0019-adapt-test-certs-generation.patch

5 months agoDisable test concurrency without concurrent_ruby
Lucas Nussbaum [Wed, 5 Feb 2025 13:17:14 +0000 (14:17 +0100)]
Disable test concurrency without concurrent_ruby

The way this is implemented (moving away the gem in $HOME) looks dangerous and
doesn't work for non-user-installed packages.

Forwarded: not-needed

Gbp-Pq: Name 0010-Disable-test-concurrency-without-concurrent_ruby.patch

5 months agoSkip tests failing with ruby3.2 in Ubuntu
Debian Ruby Team [Mon, 23 Dec 2024 22:26:53 +0000 (19:26 -0300)]
Skip tests failing with ruby3.2 in Ubuntu

  1) Error:
TestRackUp::RackUp#test_bin:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/test/test_rack_handler.rb:318:in `sysread'
    /<<PKGBUILDDIR>>/test/test_rack_handler.rb:318:in `test_bin'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

Those tests reported the following errors:

  2) Error:
TestCLI#test_control_clustered:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/test/test_cli.rb:136:in `join'
    /<<PKGBUILDDIR>>/test/test_cli.rb:136:in `test_control_clustered'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  3) Error:
TestPluginSystemd#test_systemd_notify_usr2_hot_restart_cluster:
Errno::EPIPE: Broken pipe
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:90:in `write'
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:90:in `assert_restarts_with_systemd'
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:42:in `test_systemd_notify_usr2_hot_restart_cluster'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  4) Error:
TestIntegrationPumactl#test_halt_unix:
Errno::ECHILD: No child processes
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `wait2'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `ctl_unix'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:42:in `test_halt_unix'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  5) Error:
TestIntegrationPumactl#test_stop_unix:
Errno::ECHILD: No child processes
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `wait2'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `ctl_unix'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:38:in `test_stop_unix'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  6) Error:
TestPumaServer#test_timeout_in_data_phase:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/debian/puma/usr/lib/x86_64-linux-gnu/rubygems-integration/3.2.0/gems/puma-6.4.2/lib/puma/server.rb:627:in `join'
    /<<PKGBUILDDIR>>/debian/puma/usr/lib/x86_64-linux-gnu/rubygems-integration/3.2.0/gems/puma-6.4.2/lib/puma/server.rb:627:in `stop'
    /<<PKGBUILDDIR>>/test/test_puma_server.rb:31:in `teardown'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `block (5 levels) in run'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `each'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:95:in `block (3 levels) in run'
 .
 Extra failure in Debian:
 .
  1) Error:
TestIntegrationSingle#test_puma_debug_loaded_exts:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:125:in `wait2'
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:125:in `stop_server'
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:39:in `teardown'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `block (5 levels) in run'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `each'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `block (4 levels) in run'
    /usr/lib/ruby/3.3.0/timeout.rb:186:in `block in timeout'
    /usr/lib/ruby/3.3.0/timeout.rb:193:in `timeout'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:95:in `block (3 levels) in run'
 .
 They do not seem real regressions, so skipping them for now.
Author: Lucas Kanashiro <lucas.kanashiro@canonical.com>
Last-Updated: 2024-12-23
Forwarded: not-needed

Gbp-Pq: Name 0018-disable-test-failing-with-ruby3.2.patch

5 months agodisable-test-failing-on-armhf
Debian Ruby Team [Thu, 17 Jul 2025 10:20:19 +0000 (07:20 -0300)]
disable-test-failing-on-armhf

https://ci.debian.net/packages/p/puma/testing/armhf/42745746/

Gbp-Pq: Name 0017-disable-test-failing-on-armhf.patch

5 months agodisable-test-failing-on-arm64
Debian Ruby Team [Thu, 17 Jul 2025 10:20:19 +0000 (07:20 -0300)]
disable-test-failing-on-arm64

this test is failing on arm64 buildd (sometimes on other archs as well)

Gbp-Pq: Name 0016-disable-test-failing-on-arm64.patch

5 months agodisable-different-output-test
Debian Ruby Team [Thu, 17 Jul 2025 10:20:19 +0000 (07:20 -0300)]
disable-different-output-test

Output changed from 'OK' to '::Rack::URLMap is loaded'

Output changed from 'OK' to '::Rack::URLMap is loaded'

Gbp-Pq: Name 0015-disable-different-output-test.patch

5 months agoDisable test that failied on amd64 buildd
Pirate Praveen [Mon, 8 Mar 2021 17:33:21 +0000 (23:03 +0530)]
Disable test that failied on amd64 buildd

This test failed on amd64 buildd
https://buildd.debian.org/status/fetch.php?pkg=puma&arch=amd64&ver=5.2.2-1&stamp=1615133735&raw=0

Forwarded: not-needed

Gbp-Pq: Name 0014-disable-test-failing-on-amd64.patch

5 months agoFix test to read output locale independent
Daniel Leidert [Thu, 6 Feb 2020 10:24:24 +0000 (11:24 +0100)]
Fix test to read output locale independent

The test fails if run in a non-English environment.

Forwarded: https://github.com/puma/puma/issues/2149

Gbp-Pq: Name 0013-fix-test-term-not-accepts-new-connections.patch

5 months agoDisable cli ssl tests
Daniel Leidert [Wed, 5 Feb 2020 22:18:37 +0000 (23:18 +0100)]
Disable cli ssl tests

Forwarded: not-needed

Gbp-Pq: Name 0012-disable-cli-ssl-tests.patch

5 months agoDisable unavailable minitest extensions
Daniel Leidert [Wed, 5 Feb 2020 21:20:42 +0000 (22:20 +0100)]
Disable unavailable minitest extensions

Forwarded: not-needed

Gbp-Pq: Name 0011-disable-minitest-extensions.patch

5 months agoDrop git usage from gemspec
Antonio Terceiro [Wed, 5 Feb 2020 20:36:05 +0000 (21:36 +0100)]
Drop git usage from gemspec

Forwarded: not-needed

Gbp-Pq: Name 0004-puma.gemspec-drop-git-usage.patch

5 months agopuma (6.6.0-4) unstable; urgency=medium
Athos Ribeiro [Thu, 17 Jul 2025 10:20:19 +0000 (07:20 -0300)]
puma (6.6.0-4) unstable; urgency=medium

  * Team upload.
  * Do not generate example certificates in build time to avoid build
    depending on Java
  * d/p/0019-adapt-test-certs-generation.patch: adjust example certificates
    generation script
  * d/p/0020-update-ex-certs.patch: update example certificates to avoid a
    regression for #1078640
  * debian/README.source: document test certificates generation

[dgit import unpatched puma 6.6.0-4]

5 months agoImport puma_6.6.0-4.debian.tar.xz
Athos Ribeiro [Thu, 17 Jul 2025 10:20:19 +0000 (07:20 -0300)]
Import puma_6.6.0-4.debian.tar.xz

[dgit import tarball puma 6.6.0-4 puma_6.6.0-4.debian.tar.xz]

10 months agoMerge puma (6.6.0-2+rpi1) import into refs/heads/workingbranch
Peter Michael Green [Thu, 13 Feb 2025 15:24:52 +0000 (15:24 +0000)]
Merge puma (6.6.0-2+rpi1) import into refs/heads/workingbranch

10 months agoDisable test concurrency without concurrent_ruby
Lucas Nussbaum [Wed, 5 Feb 2025 13:17:14 +0000 (14:17 +0100)]
Disable test concurrency without concurrent_ruby

The way this is implemented (moving away the gem in $HOME) looks dangerous and
doesn't work for non-user-installed packages.

Forwarded: not-needed

Gbp-Pq: Name 0010-Disable-test-concurrency-without-concurrent_ruby.patch

10 months agoSkip tests failing with ruby3.2 in Ubuntu
Debian Ruby Team [Mon, 23 Dec 2024 22:26:53 +0000 (19:26 -0300)]
Skip tests failing with ruby3.2 in Ubuntu

  1) Error:
TestRackUp::RackUp#test_bin:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/test/test_rack_handler.rb:318:in `sysread'
    /<<PKGBUILDDIR>>/test/test_rack_handler.rb:318:in `test_bin'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

Those tests reported the following errors:

  2) Error:
TestCLI#test_control_clustered:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/test/test_cli.rb:136:in `join'
    /<<PKGBUILDDIR>>/test/test_cli.rb:136:in `test_control_clustered'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  3) Error:
TestPluginSystemd#test_systemd_notify_usr2_hot_restart_cluster:
Errno::EPIPE: Broken pipe
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:90:in `write'
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:90:in `assert_restarts_with_systemd'
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:42:in `test_systemd_notify_usr2_hot_restart_cluster'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  4) Error:
TestIntegrationPumactl#test_halt_unix:
Errno::ECHILD: No child processes
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `wait2'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `ctl_unix'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:42:in `test_halt_unix'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  5) Error:
TestIntegrationPumactl#test_stop_unix:
Errno::ECHILD: No child processes
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `wait2'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `ctl_unix'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:38:in `test_stop_unix'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  6) Error:
TestPumaServer#test_timeout_in_data_phase:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/debian/puma/usr/lib/x86_64-linux-gnu/rubygems-integration/3.2.0/gems/puma-6.4.2/lib/puma/server.rb:627:in `join'
    /<<PKGBUILDDIR>>/debian/puma/usr/lib/x86_64-linux-gnu/rubygems-integration/3.2.0/gems/puma-6.4.2/lib/puma/server.rb:627:in `stop'
    /<<PKGBUILDDIR>>/test/test_puma_server.rb:31:in `teardown'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `block (5 levels) in run'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `each'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:95:in `block (3 levels) in run'
 .
 Extra failure in Debian:
 .
  1) Error:
TestIntegrationSingle#test_puma_debug_loaded_exts:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:125:in `wait2'
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:125:in `stop_server'
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:39:in `teardown'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `block (5 levels) in run'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `each'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `block (4 levels) in run'
    /usr/lib/ruby/3.3.0/timeout.rb:186:in `block in timeout'
    /usr/lib/ruby/3.3.0/timeout.rb:193:in `timeout'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:95:in `block (3 levels) in run'
 .
 They do not seem real regressions, so skipping them for now.
Author: Lucas Kanashiro <lucas.kanashiro@canonical.com>
Last-Updated: 2024-12-23
Forwarded: not-needed

Gbp-Pq: Name 0018-disable-test-failing-with-ruby3.2.patch

10 months agodisable-test-failing-on-armhf
Debian Ruby Team [Thu, 13 Feb 2025 15:24:52 +0000 (15:24 +0000)]
disable-test-failing-on-armhf

https://ci.debian.net/packages/p/puma/testing/armhf/42745746/

Gbp-Pq: Name 0017-disable-test-failing-on-armhf.patch

10 months agodisable-test-failing-on-arm64
Debian Ruby Team [Thu, 13 Feb 2025 15:24:52 +0000 (15:24 +0000)]
disable-test-failing-on-arm64

this test is failing on arm64 buildd (sometimes on other archs as well)

Gbp-Pq: Name 0016-disable-test-failing-on-arm64.patch

10 months agodisable-different-output-test
Debian Ruby Team [Thu, 13 Feb 2025 15:24:52 +0000 (15:24 +0000)]
disable-different-output-test

Output changed from 'OK' to '::Rack::URLMap is loaded'

Output changed from 'OK' to '::Rack::URLMap is loaded'

Gbp-Pq: Name 0015-disable-different-output-test.patch

10 months agoDisable test that failied on amd64 buildd
Pirate Praveen [Mon, 8 Mar 2021 17:33:21 +0000 (23:03 +0530)]
Disable test that failied on amd64 buildd

This test failed on amd64 buildd
https://buildd.debian.org/status/fetch.php?pkg=puma&arch=amd64&ver=5.2.2-1&stamp=1615133735&raw=0

Forwarded: not-needed

Gbp-Pq: Name 0014-disable-test-failing-on-amd64.patch

10 months agoFix test to read output locale independent
Daniel Leidert [Thu, 6 Feb 2020 10:24:24 +0000 (11:24 +0100)]
Fix test to read output locale independent

The test fails if run in a non-English environment.

Forwarded: https://github.com/puma/puma/issues/2149

Gbp-Pq: Name 0013-fix-test-term-not-accepts-new-connections.patch

10 months agoDisable cli ssl tests
Daniel Leidert [Wed, 5 Feb 2020 22:18:37 +0000 (23:18 +0100)]
Disable cli ssl tests

Forwarded: not-needed

Gbp-Pq: Name 0012-disable-cli-ssl-tests.patch

10 months agoDisable unavailable minitest extensions
Daniel Leidert [Wed, 5 Feb 2020 21:20:42 +0000 (22:20 +0100)]
Disable unavailable minitest extensions

Forwarded: not-needed

Gbp-Pq: Name 0011-disable-minitest-extensions.patch

10 months agoDrop git usage from gemspec
Antonio Terceiro [Wed, 5 Feb 2020 20:36:05 +0000 (21:36 +0100)]
Drop git usage from gemspec

Forwarded: not-needed

Gbp-Pq: Name 0004-puma.gemspec-drop-git-usage.patch

10 months agopuma (6.6.0-2+rpi1) trixie-staging; urgency=medium
Peter Michael Green [Thu, 13 Feb 2025 15:24:52 +0000 (15:24 +0000)]
puma (6.6.0-2+rpi1) trixie-staging; urgency=medium

  * Disable testsuite.

[dgit import unpatched puma 6.6.0-2+rpi1]

10 months agoImport puma_6.6.0-2+rpi1.debian.tar.xz
Peter Michael Green [Thu, 13 Feb 2025 15:24:52 +0000 (15:24 +0000)]
Import puma_6.6.0-2+rpi1.debian.tar.xz

[dgit import tarball puma 6.6.0-2+rpi1 puma_6.6.0-2+rpi1.debian.tar.xz]

10 months agoMerge puma (6.6.0-2) import into refs/heads/workingbranch
Lucas Nussbaum [Fri, 7 Feb 2025 20:46:17 +0000 (21:46 +0100)]
Merge puma (6.6.0-2) import into refs/heads/workingbranch

10 months agoDisable test concurrency without concurrent_ruby
Lucas Nussbaum [Wed, 5 Feb 2025 13:17:14 +0000 (14:17 +0100)]
Disable test concurrency without concurrent_ruby

The way this is implemented (moving away the gem in $HOME) looks dangerous and
doesn't work for non-user-installed packages.

Forwarded: not-needed

Gbp-Pq: Name 0010-Disable-test-concurrency-without-concurrent_ruby.patch

10 months agoSkip tests failing with ruby3.2 in Ubuntu
Debian Ruby Team [Mon, 23 Dec 2024 22:26:53 +0000 (19:26 -0300)]
Skip tests failing with ruby3.2 in Ubuntu

  1) Error:
TestRackUp::RackUp#test_bin:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/test/test_rack_handler.rb:318:in `sysread'
    /<<PKGBUILDDIR>>/test/test_rack_handler.rb:318:in `test_bin'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

Those tests reported the following errors:

  2) Error:
TestCLI#test_control_clustered:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/test/test_cli.rb:136:in `join'
    /<<PKGBUILDDIR>>/test/test_cli.rb:136:in `test_control_clustered'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  3) Error:
TestPluginSystemd#test_systemd_notify_usr2_hot_restart_cluster:
Errno::EPIPE: Broken pipe
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:90:in `write'
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:90:in `assert_restarts_with_systemd'
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:42:in `test_systemd_notify_usr2_hot_restart_cluster'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  4) Error:
TestIntegrationPumactl#test_halt_unix:
Errno::ECHILD: No child processes
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `wait2'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `ctl_unix'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:42:in `test_halt_unix'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  5) Error:
TestIntegrationPumactl#test_stop_unix:
Errno::ECHILD: No child processes
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `wait2'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `ctl_unix'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:38:in `test_stop_unix'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  6) Error:
TestPumaServer#test_timeout_in_data_phase:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/debian/puma/usr/lib/x86_64-linux-gnu/rubygems-integration/3.2.0/gems/puma-6.4.2/lib/puma/server.rb:627:in `join'
    /<<PKGBUILDDIR>>/debian/puma/usr/lib/x86_64-linux-gnu/rubygems-integration/3.2.0/gems/puma-6.4.2/lib/puma/server.rb:627:in `stop'
    /<<PKGBUILDDIR>>/test/test_puma_server.rb:31:in `teardown'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `block (5 levels) in run'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `each'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:95:in `block (3 levels) in run'
 .
 Extra failure in Debian:
 .
  1) Error:
TestIntegrationSingle#test_puma_debug_loaded_exts:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:125:in `wait2'
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:125:in `stop_server'
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:39:in `teardown'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `block (5 levels) in run'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `each'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `block (4 levels) in run'
    /usr/lib/ruby/3.3.0/timeout.rb:186:in `block in timeout'
    /usr/lib/ruby/3.3.0/timeout.rb:193:in `timeout'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:95:in `block (3 levels) in run'
 .
 They do not seem real regressions, so skipping them for now.
Author: Lucas Kanashiro <lucas.kanashiro@canonical.com>
Last-Updated: 2024-12-23
Forwarded: not-needed

Gbp-Pq: Name 0018-disable-test-failing-with-ruby3.2.patch

10 months agodisable-test-failing-on-armhf
Debian Ruby Team [Fri, 7 Feb 2025 20:46:17 +0000 (21:46 +0100)]
disable-test-failing-on-armhf

https://ci.debian.net/packages/p/puma/testing/armhf/42745746/

Gbp-Pq: Name 0017-disable-test-failing-on-armhf.patch

10 months agodisable-test-failing-on-arm64
Debian Ruby Team [Fri, 7 Feb 2025 20:46:17 +0000 (21:46 +0100)]
disable-test-failing-on-arm64

this test is failing on arm64 buildd (sometimes on other archs as well)

Gbp-Pq: Name 0016-disable-test-failing-on-arm64.patch

10 months agodisable-different-output-test
Debian Ruby Team [Fri, 7 Feb 2025 20:46:17 +0000 (21:46 +0100)]
disable-different-output-test

Output changed from 'OK' to '::Rack::URLMap is loaded'

Output changed from 'OK' to '::Rack::URLMap is loaded'

Gbp-Pq: Name 0015-disable-different-output-test.patch

10 months agoDisable test that failied on amd64 buildd
Pirate Praveen [Mon, 8 Mar 2021 17:33:21 +0000 (23:03 +0530)]
Disable test that failied on amd64 buildd

This test failed on amd64 buildd
https://buildd.debian.org/status/fetch.php?pkg=puma&arch=amd64&ver=5.2.2-1&stamp=1615133735&raw=0

Forwarded: not-needed

Gbp-Pq: Name 0014-disable-test-failing-on-amd64.patch

10 months agoFix test to read output locale independent
Daniel Leidert [Thu, 6 Feb 2020 10:24:24 +0000 (11:24 +0100)]
Fix test to read output locale independent

The test fails if run in a non-English environment.

Forwarded: https://github.com/puma/puma/issues/2149

Gbp-Pq: Name 0013-fix-test-term-not-accepts-new-connections.patch

10 months agoDisable cli ssl tests
Daniel Leidert [Wed, 5 Feb 2020 22:18:37 +0000 (23:18 +0100)]
Disable cli ssl tests

Forwarded: not-needed

Gbp-Pq: Name 0012-disable-cli-ssl-tests.patch

10 months agoDisable unavailable minitest extensions
Daniel Leidert [Wed, 5 Feb 2020 21:20:42 +0000 (22:20 +0100)]
Disable unavailable minitest extensions

Forwarded: not-needed

Gbp-Pq: Name 0011-disable-minitest-extensions.patch

10 months agoDrop git usage from gemspec
Antonio Terceiro [Wed, 5 Feb 2020 20:36:05 +0000 (21:36 +0100)]
Drop git usage from gemspec

Forwarded: not-needed

Gbp-Pq: Name 0004-puma.gemspec-drop-git-usage.patch

10 months agopuma (6.6.0-2) unstable; urgency=medium
Lucas Nussbaum [Fri, 7 Feb 2025 20:46:17 +0000 (21:46 +0100)]
puma (6.6.0-2) unstable; urgency=medium

  * Team upload
  * Change build-dependency on ruby-rackup to
    ruby-rackup | ruby-rack (<< 3), to allow migration to testing
    independently of rackup or rack 3.

[dgit import unpatched puma 6.6.0-2]

10 months agoImport puma_6.6.0-2.debian.tar.xz
Lucas Nussbaum [Fri, 7 Feb 2025 20:46:17 +0000 (21:46 +0100)]
Import puma_6.6.0-2.debian.tar.xz

[dgit import tarball puma 6.6.0-2 puma_6.6.0-2.debian.tar.xz]

10 months agoImport puma_6.6.0.orig.tar.gz
Lucas Nussbaum [Wed, 5 Feb 2025 13:56:49 +0000 (14:56 +0100)]
Import puma_6.6.0.orig.tar.gz

[dgit import orig puma_6.6.0.orig.tar.gz]

10 months agoMerge puma (6.6.0-1) import into refs/heads/workingbranch
Lucas Nussbaum [Wed, 5 Feb 2025 13:56:49 +0000 (14:56 +0100)]
Merge puma (6.6.0-1) import into refs/heads/workingbranch

10 months agoDisable test concurrency without concurrent_ruby
Lucas Nussbaum [Wed, 5 Feb 2025 13:17:14 +0000 (14:17 +0100)]
Disable test concurrency without concurrent_ruby

The way this is implemented (moving away the gem in $HOME) looks dangerous and
doesn't work for non-user-installed packages.

Forwarded: not-needed

Gbp-Pq: Name 0010-Disable-test-concurrency-without-concurrent_ruby.patch

10 months agoSkip tests failing with ruby3.2 in Ubuntu
Debian Ruby Team [Mon, 23 Dec 2024 22:26:53 +0000 (19:26 -0300)]
Skip tests failing with ruby3.2 in Ubuntu

  1) Error:
TestRackUp::RackUp#test_bin:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/test/test_rack_handler.rb:318:in `sysread'
    /<<PKGBUILDDIR>>/test/test_rack_handler.rb:318:in `test_bin'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

Those tests reported the following errors:

  2) Error:
TestCLI#test_control_clustered:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/test/test_cli.rb:136:in `join'
    /<<PKGBUILDDIR>>/test/test_cli.rb:136:in `test_control_clustered'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  3) Error:
TestPluginSystemd#test_systemd_notify_usr2_hot_restart_cluster:
Errno::EPIPE: Broken pipe
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:90:in `write'
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:90:in `assert_restarts_with_systemd'
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:42:in `test_systemd_notify_usr2_hot_restart_cluster'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  4) Error:
TestIntegrationPumactl#test_halt_unix:
Errno::ECHILD: No child processes
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `wait2'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `ctl_unix'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:42:in `test_halt_unix'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  5) Error:
TestIntegrationPumactl#test_stop_unix:
Errno::ECHILD: No child processes
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `wait2'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `ctl_unix'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:38:in `test_stop_unix'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  6) Error:
TestPumaServer#test_timeout_in_data_phase:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/debian/puma/usr/lib/x86_64-linux-gnu/rubygems-integration/3.2.0/gems/puma-6.4.2/lib/puma/server.rb:627:in `join'
    /<<PKGBUILDDIR>>/debian/puma/usr/lib/x86_64-linux-gnu/rubygems-integration/3.2.0/gems/puma-6.4.2/lib/puma/server.rb:627:in `stop'
    /<<PKGBUILDDIR>>/test/test_puma_server.rb:31:in `teardown'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `block (5 levels) in run'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `each'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:95:in `block (3 levels) in run'
 .
 Extra failure in Debian:
 .
  1) Error:
TestIntegrationSingle#test_puma_debug_loaded_exts:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:125:in `wait2'
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:125:in `stop_server'
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:39:in `teardown'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `block (5 levels) in run'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `each'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `block (4 levels) in run'
    /usr/lib/ruby/3.3.0/timeout.rb:186:in `block in timeout'
    /usr/lib/ruby/3.3.0/timeout.rb:193:in `timeout'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:95:in `block (3 levels) in run'
 .
 They do not seem real regressions, so skipping them for now.
Author: Lucas Kanashiro <lucas.kanashiro@canonical.com>
Last-Updated: 2024-12-23
Forwarded: not-needed

Gbp-Pq: Name 0018-disable-test-failing-with-ruby3.2.patch

10 months agodisable-test-failing-on-armhf
Debian Ruby Team [Wed, 5 Feb 2025 13:56:49 +0000 (14:56 +0100)]
disable-test-failing-on-armhf

https://ci.debian.net/packages/p/puma/testing/armhf/42745746/

Gbp-Pq: Name 0017-disable-test-failing-on-armhf.patch

10 months agodisable-test-failing-on-arm64
Debian Ruby Team [Wed, 5 Feb 2025 13:56:49 +0000 (14:56 +0100)]
disable-test-failing-on-arm64

this test is failing on arm64 buildd (sometimes on other archs as well)

Gbp-Pq: Name 0016-disable-test-failing-on-arm64.patch

10 months agodisable-different-output-test
Debian Ruby Team [Wed, 5 Feb 2025 13:56:49 +0000 (14:56 +0100)]
disable-different-output-test

Output changed from 'OK' to '::Rack::URLMap is loaded'

Output changed from 'OK' to '::Rack::URLMap is loaded'

Gbp-Pq: Name 0015-disable-different-output-test.patch

10 months agoDisable test that failied on amd64 buildd
Pirate Praveen [Mon, 8 Mar 2021 17:33:21 +0000 (23:03 +0530)]
Disable test that failied on amd64 buildd

This test failed on amd64 buildd
https://buildd.debian.org/status/fetch.php?pkg=puma&arch=amd64&ver=5.2.2-1&stamp=1615133735&raw=0

Forwarded: not-needed

Gbp-Pq: Name 0014-disable-test-failing-on-amd64.patch

10 months agoFix test to read output locale independent
Daniel Leidert [Thu, 6 Feb 2020 10:24:24 +0000 (11:24 +0100)]
Fix test to read output locale independent

The test fails if run in a non-English environment.

Forwarded: https://github.com/puma/puma/issues/2149

Gbp-Pq: Name 0013-fix-test-term-not-accepts-new-connections.patch

10 months agoDisable cli ssl tests
Daniel Leidert [Wed, 5 Feb 2020 22:18:37 +0000 (23:18 +0100)]
Disable cli ssl tests

Forwarded: not-needed

Gbp-Pq: Name 0012-disable-cli-ssl-tests.patch

10 months agoDisable unavailable minitest extensions
Daniel Leidert [Wed, 5 Feb 2020 21:20:42 +0000 (22:20 +0100)]
Disable unavailable minitest extensions

Forwarded: not-needed

Gbp-Pq: Name 0011-disable-minitest-extensions.patch

10 months agoDrop git usage from gemspec
Antonio Terceiro [Wed, 5 Feb 2020 20:36:05 +0000 (21:36 +0100)]
Drop git usage from gemspec

Forwarded: not-needed

Gbp-Pq: Name 0004-puma.gemspec-drop-git-usage.patch

10 months agopuma (6.6.0-1) unstable; urgency=medium
Lucas Nussbaum [Wed, 5 Feb 2025 13:56:49 +0000 (14:56 +0100)]
puma (6.6.0-1) unstable; urgency=medium

  * Team upload
  * New upstream version 6.5.0, with fixes for rack 3. Closes: #1094539
  * Refresh patches for 6.5.0
  * Drop patches (were upstream backports, so no longer needed):
      + 0009-CI-update-chain-certs-example-files-3426.patch
      + 0010-Update-all-certs.patch
      + 0011-Fix-path-of-certs-useb-by-test_example_cert_expirati.patch
      + 0014-Give-a-wide-berth-on-the-timeout-as-sometimes-CI-is-.patch
      + 0018-update-certs-from-upstream.patch
  * Refresh packaging using dh-make-ruby
  * Add build-dep on rackup for Rack::Handler
  * New upstream version 6.6.0
  * Refresh patches again, for 6.6.0
  * Add build-dep on ruby-concurrent
  * Add patch: 0010-Disable-test-concurrency-without-concurrent_ruby.patch
  * Drop unmatched lintian override

[dgit import unpatched puma 6.6.0-1]

10 months agoImport puma_6.6.0-1.debian.tar.xz
Lucas Nussbaum [Wed, 5 Feb 2025 13:56:49 +0000 (14:56 +0100)]
Import puma_6.6.0-1.debian.tar.xz

[dgit import tarball puma 6.6.0-1 puma_6.6.0-1.debian.tar.xz]

11 months agoMerge puma (6.4.3-2) import into refs/heads/workingbranch
Lucas Kanashiro [Mon, 23 Dec 2024 22:07:19 +0000 (19:07 -0300)]
Merge puma (6.4.3-2) import into refs/heads/workingbranch

11 months agoSkip tests failing with ruby3.2 in Ubuntu
Debian Ruby Team [Mon, 23 Dec 2024 22:26:53 +0000 (19:26 -0300)]
Skip tests failing with ruby3.2 in Ubuntu

  1) Error:
TestRackUp::RackUp#test_bin:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/test/test_rack_handler.rb:318:in `sysread'
    /<<PKGBUILDDIR>>/test/test_rack_handler.rb:318:in `test_bin'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

Those tests reported the following errors:

  2) Error:
TestCLI#test_control_clustered:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/test/test_cli.rb:136:in `join'
    /<<PKGBUILDDIR>>/test/test_cli.rb:136:in `test_control_clustered'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  3) Error:
TestPluginSystemd#test_systemd_notify_usr2_hot_restart_cluster:
Errno::EPIPE: Broken pipe
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:90:in `write'
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:90:in `assert_restarts_with_systemd'
    /<<PKGBUILDDIR>>/test/test_plugin_systemd.rb:42:in `test_systemd_notify_usr2_hot_restart_cluster'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  4) Error:
TestIntegrationPumactl#test_halt_unix:
Errno::ECHILD: No child processes
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `wait2'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `ctl_unix'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:42:in `test_halt_unix'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  5) Error:
TestIntegrationPumactl#test_stop_unix:
Errno::ECHILD: No child processes
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `wait2'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:55:in `ctl_unix'
    /<<PKGBUILDDIR>>/test/test_integration_pumactl.rb:38:in `test_stop_unix'
    /<<PKGBUILDDIR>>/test/helper.rb:90:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:88:in `block (3 levels) in run'

  6) Error:
TestPumaServer#test_timeout_in_data_phase:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /<<PKGBUILDDIR>>/debian/puma/usr/lib/x86_64-linux-gnu/rubygems-integration/3.2.0/gems/puma-6.4.2/lib/puma/server.rb:627:in `join'
    /<<PKGBUILDDIR>>/debian/puma/usr/lib/x86_64-linux-gnu/rubygems-integration/3.2.0/gems/puma-6.4.2/lib/puma/server.rb:627:in `stop'
    /<<PKGBUILDDIR>>/test/test_puma_server.rb:31:in `teardown'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `block (5 levels) in run'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `each'
    /<<PKGBUILDDIR>>/test/helper.rb:96:in `block (4 levels) in run'
    /usr/lib/ruby/3.2.0/timeout.rb:189:in `block in timeout'
    /usr/lib/ruby/3.2.0/timeout.rb:196:in `timeout'
    /<<PKGBUILDDIR>>/test/helper.rb:95:in `block (3 levels) in run'
 .
 Extra failure in Debian:
 .
  1) Error:
TestIntegrationSingle#test_puma_debug_loaded_exts:
TimeoutEveryTestCase::TestTookTooLong: execution expired
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:125:in `wait2'
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:125:in `stop_server'
    /build/reproducible-path/puma-6.4.3/test/helpers/integration.rb:39:in `teardown'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `block (5 levels) in run'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `each'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:96:in `block (4 levels) in run'
    /usr/lib/ruby/3.3.0/timeout.rb:186:in `block in timeout'
    /usr/lib/ruby/3.3.0/timeout.rb:193:in `timeout'
    /build/reproducible-path/puma-6.4.3/test/helper.rb:95:in `block (3 levels) in run'
 .
 They do not seem real regressions, so skipping them for now.
Author: Lucas Kanashiro <lucas.kanashiro@canonical.com>
Last-Updated: 2024-12-23
Forwarded: not-needed

Gbp-Pq: Name 0018-disable-test-failing-with-ruby3.2.patch

11 months ago[PATCH] CI: update client certs example files (#3440)
Kartikey Tanna [Sat, 10 Aug 2024 15:31:12 +0000 (21:01 +0530)]
[PATCH] CI: update client certs example files (#3440)

Certs regenerated with

    ruby examples/puma/client-certs/generate_client_test.rb

Gbp-Pq: Name 0018-update-certs-from-upstream.patch

11 months agoFix path of certs useb by test_example_cert_expiration.rb
Lucas Kanashiro [Thu, 19 Sep 2024 20:44:55 +0000 (17:44 -0300)]
Fix path of certs useb by test_example_cert_expiration.rb

Forwarded: not-needed

Gbp-Pq: Name 0011-Fix-path-of-certs-useb-by-test_example_cert_expirati.patch

11 months agoUpdate all certs
MSP-Greg [Sun, 11 Aug 2024 19:29:44 +0000 (14:29 -0500)]
Update all certs

Origin: upstream, https://github.com/puma/puma/commit/6db7c28b069710419cc
Debian-Bug: https://bugs.debian.org/cgi-bin/bugreport.cgi?bug=1078640

Gbp-Pq: Name 0010-Update-all-certs.patch

11 months agoCI: update chain certs example files (#3426)
Patrik Ragnarsson [Sun, 14 Jul 2024 16:44:29 +0000 (18:44 +0200)]
CI: update chain certs example files (#3426)

Ran "ruby examples/puma/chain_cert/generate_chain_test.rb"

examples/puma/chain_cert/cert.crt expired June 5, 2024 before this change, causing test failures.

Origin: upstream, https://github.com/puma/puma/commit/11e5d6dcbf0f6bfb170f38c5713d5851399a55dd

Gbp-Pq: Name 0009-CI-update-chain-certs-example-files-3426.patch

11 months agodisable-test-failing-on-armhf
Debian Ruby Team [Mon, 23 Dec 2024 22:07:19 +0000 (19:07 -0300)]
disable-test-failing-on-armhf

https://ci.debian.net/packages/p/puma/testing/armhf/42745746/

Gbp-Pq: Name 0017-disable-test-failing-on-armhf.patch

11 months agodisable-test-failing-on-arm64
Debian Ruby Team [Mon, 23 Dec 2024 22:07:19 +0000 (19:07 -0300)]
disable-test-failing-on-arm64

this test is failing on arm64 buildd (sometimes on other archs as well)

Gbp-Pq: Name 0016-disable-test-failing-on-arm64.patch

11 months agodisable-different-output-test
Debian Ruby Team [Mon, 23 Dec 2024 22:07:19 +0000 (19:07 -0300)]
disable-different-output-test

Output changed from 'OK' to '::Rack::URLMap is loaded'

Output changed from 'OK' to '::Rack::URLMap is loaded'

Gbp-Pq: Name 0015-disable-different-output-test.patch

11 months agoDisable test that failied on amd64 buildd
Pirate Praveen [Mon, 8 Mar 2021 17:33:21 +0000 (23:03 +0530)]
Disable test that failied on amd64 buildd

This test failed on amd64 buildd
https://buildd.debian.org/status/fetch.php?pkg=puma&arch=amd64&ver=5.2.2-1&stamp=1615133735&raw=0

Forwarded: not-needed

Gbp-Pq: Name 0014-disable-test-failing-on-amd64.patch

11 months agoFix test to read output locale independent
Daniel Leidert [Thu, 6 Feb 2020 10:24:24 +0000 (11:24 +0100)]
Fix test to read output locale independent

The test fails if run in a non-English environment.

Forwarded: https://github.com/puma/puma/issues/2149

Gbp-Pq: Name 0013-fix-test-term-not-accepts-new-connections.patch

11 months agoDisable cli ssl tests
Daniel Leidert [Wed, 5 Feb 2020 22:18:37 +0000 (23:18 +0100)]
Disable cli ssl tests

Forwarded: not-needed

Gbp-Pq: Name 0012-disable-cli-ssl-tests.patch

11 months agoDisable unavailable minitest extensions
Daniel Leidert [Wed, 5 Feb 2020 21:20:42 +0000 (22:20 +0100)]
Disable unavailable minitest extensions

Forwarded: not-needed

Gbp-Pq: Name 0011-disable-minitest-extensions.patch

11 months agoDrop git usage from gemspec
Antonio Terceiro [Wed, 5 Feb 2020 20:36:05 +0000 (21:36 +0100)]
Drop git usage from gemspec

Forwarded: not-needed

Gbp-Pq: Name 0004-puma.gemspec-drop-git-usage.patch

11 months agopuma (6.4.3-2) unstable; urgency=medium
Lucas Kanashiro [Mon, 23 Dec 2024 22:07:19 +0000 (19:07 -0300)]
puma (6.4.3-2) unstable; urgency=medium

  * Team upload.
  * d/p/0018-disable-test-failing-with-ruby3.2.patch: fix FTBFS

[dgit import unpatched puma 6.4.3-2]

11 months agoImport puma_6.4.3-2.debian.tar.xz
Lucas Kanashiro [Mon, 23 Dec 2024 22:07:19 +0000 (19:07 -0300)]
Import puma_6.4.3-2.debian.tar.xz

[dgit import tarball puma 6.4.3-2 puma_6.4.3-2.debian.tar.xz]

14 months agoMerge puma (6.4.3-1) import into refs/heads/workingbranch
Abhijith PA [Mon, 30 Sep 2024 04:16:18 +0000 (09:46 +0530)]
Merge puma (6.4.3-1) import into refs/heads/workingbranch

14 months agoImport puma_6.4.3.orig.tar.gz
Abhijith PA [Mon, 30 Sep 2024 04:16:18 +0000 (09:46 +0530)]
Import puma_6.4.3.orig.tar.gz

[dgit import orig puma_6.4.3.orig.tar.gz]

14 months ago[PATCH] CI: update client certs example files (#3440)
Kartikey Tanna [Sat, 10 Aug 2024 15:31:12 +0000 (21:01 +0530)]
[PATCH] CI: update client certs example files (#3440)

Certs regenerated with

    ruby examples/puma/client-certs/generate_client_test.rb

Gbp-Pq: Name 0018-update-certs-from-upstream.patch

14 months agoFix path of certs useb by test_example_cert_expiration.rb
Lucas Kanashiro [Thu, 19 Sep 2024 20:44:55 +0000 (17:44 -0300)]
Fix path of certs useb by test_example_cert_expiration.rb

Forwarded: not-needed

Gbp-Pq: Name 0011-Fix-path-of-certs-useb-by-test_example_cert_expirati.patch

14 months agoUpdate all certs
MSP-Greg [Sun, 11 Aug 2024 19:29:44 +0000 (14:29 -0500)]
Update all certs

Origin: upstream, https://github.com/puma/puma/commit/6db7c28b069710419cc
Debian-Bug: https://bugs.debian.org/cgi-bin/bugreport.cgi?bug=1078640

Gbp-Pq: Name 0010-Update-all-certs.patch

14 months agoCI: update chain certs example files (#3426)
Patrik Ragnarsson [Sun, 14 Jul 2024 16:44:29 +0000 (18:44 +0200)]
CI: update chain certs example files (#3426)

Ran "ruby examples/puma/chain_cert/generate_chain_test.rb"

examples/puma/chain_cert/cert.crt expired June 5, 2024 before this change, causing test failures.

Origin: upstream, https://github.com/puma/puma/commit/11e5d6dcbf0f6bfb170f38c5713d5851399a55dd

Gbp-Pq: Name 0009-CI-update-chain-certs-example-files-3426.patch

14 months agodisable-test-failing-on-armhf
Debian Ruby Team [Mon, 30 Sep 2024 04:16:18 +0000 (09:46 +0530)]
disable-test-failing-on-armhf

https://ci.debian.net/packages/p/puma/testing/armhf/42745746/

Gbp-Pq: Name 0017-disable-test-failing-on-armhf.patch

14 months agodisable-test-failing-on-arm64
Debian Ruby Team [Mon, 30 Sep 2024 04:16:18 +0000 (09:46 +0530)]
disable-test-failing-on-arm64

this test is failing on arm64 buildd (sometimes on other archs as well)

Gbp-Pq: Name 0016-disable-test-failing-on-arm64.patch

14 months agodisable-different-output-test
Debian Ruby Team [Mon, 30 Sep 2024 04:16:18 +0000 (09:46 +0530)]
disable-different-output-test

Output changed from 'OK' to '::Rack::URLMap is loaded'

Output changed from 'OK' to '::Rack::URLMap is loaded'

Gbp-Pq: Name 0015-disable-different-output-test.patch

14 months agoDisable test that failied on amd64 buildd
Pirate Praveen [Mon, 8 Mar 2021 17:33:21 +0000 (23:03 +0530)]
Disable test that failied on amd64 buildd

This test failed on amd64 buildd
https://buildd.debian.org/status/fetch.php?pkg=puma&arch=amd64&ver=5.2.2-1&stamp=1615133735&raw=0

Forwarded: not-needed

Gbp-Pq: Name 0014-disable-test-failing-on-amd64.patch

14 months agoFix test to read output locale independent
Daniel Leidert [Thu, 6 Feb 2020 10:24:24 +0000 (11:24 +0100)]
Fix test to read output locale independent

The test fails if run in a non-English environment.

Forwarded: https://github.com/puma/puma/issues/2149

Gbp-Pq: Name 0013-fix-test-term-not-accepts-new-connections.patch

14 months agoDisable cli ssl tests
Daniel Leidert [Wed, 5 Feb 2020 22:18:37 +0000 (23:18 +0100)]
Disable cli ssl tests

Forwarded: not-needed

Gbp-Pq: Name 0012-disable-cli-ssl-tests.patch

14 months agoDisable unavailable minitest extensions
Daniel Leidert [Wed, 5 Feb 2020 21:20:42 +0000 (22:20 +0100)]
Disable unavailable minitest extensions

Forwarded: not-needed

Gbp-Pq: Name 0011-disable-minitest-extensions.patch

14 months agoDrop git usage from gemspec
Antonio Terceiro [Wed, 5 Feb 2020 20:36:05 +0000 (21:36 +0100)]
Drop git usage from gemspec

Forwarded: not-needed

Gbp-Pq: Name 0004-puma.gemspec-drop-git-usage.patch

14 months agopuma (6.4.3-1) unstable; urgency=medium
Abhijith PA [Mon, 30 Sep 2024 04:16:18 +0000 (09:46 +0530)]
puma (6.4.3-1) unstable; urgency=medium

  * Team upload.
  * New upstream version. Fixes CVE-2024-45614 (Closes: #1082379)
  * Remove custom ssl autopkgtest.
    - https://lists.debian.org/debian-ruby/2024/11/msg00006.html
  * Update certificates for tests.

[dgit import unpatched puma 6.4.3-1]

14 months agoImport puma_6.4.3-1.debian.tar.xz
Abhijith PA [Mon, 30 Sep 2024 04:16:18 +0000 (09:46 +0530)]
Import puma_6.4.3-1.debian.tar.xz

[dgit import tarball puma 6.4.3-1 puma_6.4.3-1.debian.tar.xz]

14 months agoMerge puma (6.4.2-6) import into refs/heads/workingbranch
Lucas Kanashiro [Thu, 19 Sep 2024 20:56:24 +0000 (17:56 -0300)]
Merge puma (6.4.2-6) import into refs/heads/workingbranch

14 months agoFix path of certs useb by test_example_cert_expiration.rb
Lucas Kanashiro [Thu, 19 Sep 2024 20:44:55 +0000 (17:44 -0300)]
Fix path of certs useb by test_example_cert_expiration.rb

Forwarded: not-needed

Gbp-Pq: Name 0011-Fix-path-of-certs-useb-by-test_example_cert_expirati.patch

14 months agoUpdate all certs
MSP-Greg [Sun, 11 Aug 2024 19:29:44 +0000 (14:29 -0500)]
Update all certs

Origin: upstream, https://github.com/puma/puma/commit/6db7c28b069710419cc
Debian-Bug: https://bugs.debian.org/cgi-bin/bugreport.cgi?bug=1078640

Gbp-Pq: Name 0010-Update-all-certs.patch

14 months agoCI: update chain certs example files (#3426)
Patrik Ragnarsson [Sun, 14 Jul 2024 16:44:29 +0000 (18:44 +0200)]
CI: update chain certs example files (#3426)

Ran "ruby examples/puma/chain_cert/generate_chain_test.rb"

examples/puma/chain_cert/cert.crt expired June 5, 2024 before this change, causing test failures.

Origin: upstream, https://github.com/puma/puma/commit/11e5d6dcbf0f6bfb170f38c5713d5851399a55dd

Gbp-Pq: Name 0009-CI-update-chain-certs-example-files-3426.patch

14 months agodisable-test-failing-on-armhf
Debian Ruby Team [Thu, 19 Sep 2024 20:56:24 +0000 (17:56 -0300)]
disable-test-failing-on-armhf

https://ci.debian.net/packages/p/puma/testing/armhf/42745746/

Gbp-Pq: Name 0017-disable-test-failing-on-armhf.patch

14 months agodisable-test-failing-on-arm64
Debian Ruby Team [Thu, 19 Sep 2024 20:56:24 +0000 (17:56 -0300)]
disable-test-failing-on-arm64

this test is failing on arm64 buildd (sometimes on other archs as well)

Gbp-Pq: Name 0016-disable-test-failing-on-arm64.patch

14 months agodisable-different-output-test
Debian Ruby Team [Thu, 19 Sep 2024 20:56:24 +0000 (17:56 -0300)]
disable-different-output-test

Output changed from 'OK' to '::Rack::URLMap is loaded'

Output changed from 'OK' to '::Rack::URLMap is loaded'

Gbp-Pq: Name 0015-disable-different-output-test.patch

14 months agoDisable test that failied on amd64 buildd
Pirate Praveen [Mon, 8 Mar 2021 17:33:21 +0000 (23:03 +0530)]
Disable test that failied on amd64 buildd

This test failed on amd64 buildd
https://buildd.debian.org/status/fetch.php?pkg=puma&arch=amd64&ver=5.2.2-1&stamp=1615133735&raw=0

Forwarded: not-needed

Gbp-Pq: Name 0014-disable-test-failing-on-amd64.patch

14 months agoFix test to read output locale independent
Daniel Leidert [Thu, 6 Feb 2020 10:24:24 +0000 (11:24 +0100)]
Fix test to read output locale independent

The test fails if run in a non-English environment.

Forwarded: https://github.com/puma/puma/issues/2149

Gbp-Pq: Name 0013-fix-test-term-not-accepts-new-connections.patch

14 months agoDisable cli ssl tests
Daniel Leidert [Wed, 5 Feb 2020 22:18:37 +0000 (23:18 +0100)]
Disable cli ssl tests

Forwarded: not-needed

Gbp-Pq: Name 0012-disable-cli-ssl-tests.patch

14 months agoDisable unavailable minitest extensions
Daniel Leidert [Wed, 5 Feb 2020 21:20:42 +0000 (22:20 +0100)]
Disable unavailable minitest extensions

Forwarded: not-needed

Gbp-Pq: Name 0011-disable-minitest-extensions.patch

14 months agoDrop git usage from gemspec
Antonio Terceiro [Wed, 5 Feb 2020 20:36:05 +0000 (21:36 +0100)]
Drop git usage from gemspec

Forwarded: not-needed

Gbp-Pq: Name 0004-puma.gemspec-drop-git-usage.patch