- * snext is about to be scheduled; so:
- *
- * 1. if snext->credit were less than 0 when it was taken off the
- * runqueue, then csched_schedule() should have called
- * reset_credit(). So at this point snext->credit must be greater
- * than 0.
- *
- * 2. snext's credit must be greater than or equal to anyone else
- * in the queue, so snext->credit - swait->credit must be greater
- * than or equal to 0.
- */
- ASSERT(rt_credit >= 0);
-
- /* FIXME: See if we can eliminate this conversion if we know time
- * will be outside (MIN,MAX). Probably requires pre-calculating
- * credit values of MIN,MAX per vcpu, since each vcpu burns credit
- * at a different rate. */
- time = c2t(rqd, rt_credit, snext);
-
- /* Check limits */
- if ( time < CSCHED_MIN_TIMER )
+ /* The next guy may actually have a higher credit, if we've tried to
+ * avoid migrating him from a different cpu. DTRT. */
+ if ( rt_credit <= 0 )
time = CSCHED_MIN_TIMER;
- else if ( time > CSCHED_MAX_TIMER )
- time = CSCHED_MAX_TIMER;
+ else
+ {
+ /* FIXME: See if we can eliminate this conversion if we know time
+ * will be outside (MIN,MAX). Probably requires pre-calculating
+ * credit values of MIN,MAX per vcpu, since each vcpu burns credit
+ * at a different rate. */
+ time = c2t(rqd, rt_credit, snext);
+
+ /* Check limits */
+ if ( time < CSCHED_MIN_TIMER )
+ time = CSCHED_MIN_TIMER;
+ else if ( time > CSCHED_MAX_TIMER )
+ time = CSCHED_MAX_TIMER;
+ }
return time;
}